Dedicated To Building A Foundation For Life Long Learning.

West Side News

New Superintendent's Blog

Check out the newest post by MSD Superintendent, Dr. Christine Weymouth, on her Superintendent Blog!

Update for Parents and Community!

School District of Mauston Community Field, Track & Grandstand Projects The field, track and grandstand construction work is nearing its completion deadlines. Please read further to see the progress that has happened in April and May of this past school year. In the months ahead there will be even more progress on the field, track and grandstand along with the completion of the internal construction of the new press box. In June... The preparation for seeding and soils is completed and seed is on the field New under ground irrigation system is installed and working on a regular schedule daily Observation and field work is monitored and treated weekly by landscaping contractors and MSD Building and Grounds crew to maintain new grass Complete the paving of the access road and behind-the-grandstand area and all other finishing work on the access road Final latex track surfacing completion Fencing around the grandstand installed New press box interior (finish ceiling and framing of walls and electrical wiring) completed in June and July New sound system wiring and installation completed Grandstand ramp installed In July… New grandstand structure is inspected by JW Industries. Striping and all other final work for track completion Observation and field work is monitored and treated weekly by landscaping contractors and MSD Buildings and Grounds crew to maintain new grass All surrounding ground areas near the field are leveled and prepared for grass Track and field perimeter fencing installed In August… Observation and field work is monitored and treated weekly by landscaping contractors and MSD Buildings and Grounds crew to maintain new grass Stay tuned for August updates and information and announcements about access to and use of the community field including the track, field and grandstand Use of the Field Late August and the Fall 2017… It will be important through the months of June, July and August to not have traffic on the field during the time that grass is growing. The School District of Mauston Athletic Department in concert with the school administration, Buildings and Grounds and the landscape contractor will work together to determine approval and scheduling of any and all events on the new field. Our goal has been to play only varsity soccer and football home events on the field, weather and field conditions dependent. PreviouslyIn April … Spring soil work including amendment of the field soils per design specifications Soil preparation for the installation of under-ground irrigation Site preparation on the east side of the project for the long jump and pole vault areas Concrete work in jump areas and bases for new goal posts Restoration and grading of soils around the perimeter of the track Replacement of two remaining drainage inlets Installation of electrical service for new field lighting and sound system Previously In May … Installation of irrigation system Preparation of soils for seeding Final preparation of track for addition of asphalt layer Paving of track, access drive, and as needed in bleacher area Seeding of field when weather conditions permit Installation of new fencing around track perimeter and grandstand Complete inside work on new press box The target date for completion of the community field project is scheduled for July 21, 2017. We are asking for our public’s help in protecting the field, track, grandstand and all other areas around the community field. Please do not go onto the grandstand structure as it is not completely finished at this time. Please do not enter the work area during this period of time, unless permission is given from the Superintendent’s Office. All approved visitors must be accompanied by a supervisor from Olympic Builders or by the District Director of Buildings and Grounds. Thank you for Your Cooperation and Support!! New Press Box Installed:

Video on Inclusion in the Classroom

Thanks to the students at iLEAD Charter School and Mr. Saylor for creating this video on inclusion in the classroom and equitableeducation practices.

2017-18 School Year Calendar Change

There has been an adjustment to the 2017-18 School Year Calendar. You can find the new version on the District Calendar page.

Feb. 27. 2017: Montessori Governance Council Update

An update from the January 20th meeting. Please see this document for details.

Summer School 2017

Check out our information for the upcoming Summer School 2017.

West Side Events

  • West Side Elementary
  • 708 Loomis Drive, Mauston, WI 53948
  • Phone: (608)847-1828
  • Fax: (608)847-6582
Copyright © 2017 School District of Mauston. All Rights Reserved.